- Recycled thermoplastic elastomers
- 30% recycled content
- Black pellets
EcoTPE 2K is currently available in two variants, see table below:
Process guide:
- Drying is generally not necessary but can be carried out for approx. 3-4 hours at 70°
- Cylinder temperature: Injection molding is recommended at 180-210°
- Mold temperature: 30-60°C recommended temperature